Answer:
Number of families that should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5 is at least 43.
Step-by-step explanation:
We are given that one wants to estimate the mean PSLT for the population of all families in New York City with gross incomes in the range $35.000 to $40.000.
If sigma equals 2.0, we have to find that how many families should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5.
Here, we will use the concept of Margin of error as the statement "true mean PSLT within 0.5" represents the margin of error we want.
<u></u>
<u>SO, Margin of error formula is given by;</u>
Margin of error =
where,
= significance level = 10%
= standard deviation = 2.0
n = number of families
Now, in the z table the critical value of x at 5% (
) level of significance is 1.645.
SO, Margin of error =
0.5 =

n =
= 43.3 ≈ 43
Therefore, number of families that should be surveyed if one wants to be 90% sure of being able to estimate the true mean PSLT within 0.5 is at least 43.
Answer:
((2^(-2))÷(3^3))^4=
Step-by-step explanation: expand
Answer:
b=5√3, c=10
Step-by-step explanation:
30-60-90 triangle
c=2a
b=a√3
Statistical questions: A, C, E, because they all talk about students, where B and D talk about adults and people in general. Frank just wants to know about students.
Answer:
1,455 feet
Step-by-step explanation:
Step 1:
1 : 75 Ratio Inches to Feet
Step 2:
1 : 75 = 19.4 : x Equation
Answer:
x = 1,455 Multiply
Hope This Helps :)