$489.50+x=$756.80
x=amount paz has.
756.80-489.50 = 267.3
so Paz has $267.30
5/6, 5/12, 19/45, 13/14, 19/21, 1/2, 4/9
Answer: Rate of A: 5/6
Rate of B: 3/5
A has a higher rate of change
Step-by-step explanation: You calculate slope/rate of change by determining the rise over the run. The rate of change in A is 5/6x, this is bigger than the slope of B.