Its c x<span> is positive, and </span>y<span> is negative.</span>
Answer:
c
Step-by-step explanation:
Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
Option A
Step-by-step explanation:
Let the height of plant is 'b' units.
Graph representing the height of the plant will have y-intercept = b units
Since, the plant is growing at the same rate every week,
And growth of the plant is continuous.
Therefore, graph will be a straight line and continuous.
Since, the height of the plant is always increasing,
Slope of the line will be positive.
Option A will be the answer.