Answer:
The answer to your question is:
61.- 25
62.- 26
Step-by-step explanation:
61.-
2(5x + 5) + 2(2x) = 360
10x + 10 + 4x = 360
14x = 360 - 10
14x = 350
x = 350/14
x = 25
62.-
2(4x - 4) + 2(3x + 2) = 360
8x - 8 + 6x + 4 = 360
14x - 4 = 360
14x = 360 + 4
14x = 364
x = 364 / 14
x = 26
Hello
Answer:
60 miles per hour
I have given a detailed explanation of the logic behind this.
Explanation:
Consider the structure of the wording: "miles per hour"
The word "per" means for each. There is you clue.
Each is, one of and one of is unit measurement
So the controlling element in this question is that you need to convert the 3 hours into 1 hour.
Using ratio properties
180
3
=
x
miles
1
hour
We need to 'force' the left hand side into the same form as the right. That is: we need to convert the denominator into 1 and see what happens to the numerator.
⇒
180
÷
3
3
÷
3
=
x
1
⇒
60
1
=
x
1
So the unit rate of speed is
60
miles
per
−−−
hour
Hope this helps
Plz mark me as Brainliest
9514 1404 393
Answer:
- x² = y + 16
- 4y - 1 = 7x
- (5, 9)
Step-by-step explanation:
Writing equations from words is mostly a matter of understanding what the English words mean.
If the first number is x, then the square of the first number is x². That is said to be equal to the sum of the second number (y) and 16:
x² = y + 16 . . . . the first equation
The wording "the difference of A and B" is usually intended to be interpreted to mean A-B. Here, we have the difference of 4 times the second number (4y) and 1, so ...
4y -1
This is equal to the first number (x) multiplied by 7, so ...
4y -1 = 7x . . . . the second equation
__
These can be solved a variety of ways. When no method is specified, I like to use a graphing calculator. It shows the only integer solution for this pair of equations is ...
(x, y) = (5, 9)
9514 1404 393
Answer:
Step-by-step explanation:
The form of the equation you are given is called "point-slope" form. The "slope" in this case is the per-hour fee. The point is (9 h, $195). Point-slope form generally looks like this:
y -k = m(x -h) . . . . . line with slope m through point (h, k)
Here, you have m=15, (h, k) = (9, 195), so the equation looks like ...
y -195 = 15(x -9)
__
The "one-time fee" is the cost when hours are zero.
y -195 = 15(0 -9)
y = 195 -9(15) = 60 . . . . add 195 to both sides, and evaluate
The one-time fee is $60.