Explanation:
Business xase evaluation is most useful because (BCA) provides a best-value analysis that considers not only cost but other quantifiable and non-quantifiable factors supporting an investment decision. This can include but is not limited to, performance, producibility, reliability, maintainability, and supportability enhancements.
Mark me brainliest
I believe the charger has to be connected for it to turn on.
Hmmm...that is true
Here a quizlet about if you need it!
https://quizlet.com/15207805/csci-241-flash-cards/
Answer:
Option a. int max = aList.get(0); for (int count = 1; count < aList.size(); count++) { if (aList.get(count) > max) { max = aList.get(count); } }
is the correct code snippet.
Explanation:
Following is given the explanation for the code snippet to find largest value in an integer array list aList.
- From the array list aList, very first element having index 0 will be stored in the variable max (having data type int).
- By using for starting from count =1 to count = size of array (aList), we will compare each element of the array with first element of the array.
- If any of the checked element get greater from the first element, it gets replaced in the variable max and the count is increased by 1 so that the next element may be checked.
- When the loop will end, the variable max will have the greatest value from the array aList.
i hope it will help you!
Answer:
<u>P chart</u> is the control chart that is used to monitor the rejection or acceptance whenever the bug arrival in pattern is not constant.
Explanation:
In case of only two possible outcomes, such as yes or no, accept or reject, P chart is used as control chart to track rejections. It is used to track rejections whenever the pattern of rejection is not constant. In this type of charts we collect the information from last few days to analyze and predict the next data to track rejections.
<u>For example:</u>
If we want to know that, in admission department of the university, how many students arrives to take admission in university, does not meet the qualification criteria each week. In this case there are only two options available either they meet criteria or not. In this case we use P chart with the help of previous week data to analyze the no. of students who are meeting qualification criteria in this week.