Answer: Ola
Step-by-step explanation:
Answer: X + X= 2x or X squared.
Step-by-step explanation:
Answer:
r = 16, q = 16√2
Step-by-step explanation:
This is a 45° 45° 90° triangle. In this type of triangle, the legs of said shape will be equal and the hypotenuse will be the leg length multiplied by √2.
Therefore, r = 16 and q = 16√2.
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14
The answer is six more men
Answer:
The parent function is y = x³.
After a vertical stretch by a factor of 3, obtain
y = 3x³
After a horizontal shift 4 unit to the right, obtain
y = 3(x - 4)³
After a vertical shift 3 units down, obtain
y = 3(x - 4)³ - 3
Answer: y = 3(x - 4)³ - 3