1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
boyakko [2]
3 years ago
10

Pls help on this too

Mathematics
2 answers:
snow_tiger [21]3 years ago
5 0
I’m taking this to and I need help
nadezda [96]3 years ago
3 0
I’ve attached my work...
Hope this helps!

You might be interested in
A steady wind blows a kite due west. the kite's height above ground from horizontal position x = 0 to x = 120 ft is given by y =
professor190 [17]
The derivative of the vertical position is
.. y' = 2/40*(x -50)
so the integral that gives the length of the curve the kite traveled is
distance= \int\limits^{120}_{0} {\sqrt{1+(\frac{1}{20}(x-50))^{2}} \, dx

It is convenient to let a graphing calculator compute this integral numerically. If you want to do it analytically, a table of integrals can be handy. The indefinite integral is
\frac{x-50}{40} \sqrt{(x-50)^{2}+400} +10 arcsinh(\frac{x-50}{20})
This evaluates to
\frac{1}{2}(25 \sqrt{29} +35 \sqrt{53}) +10(arcsinh( \frac{5}{2}) +arcsinh( \frac{7}{2})) \approx 230.8 feet

6 0
3 years ago
Problem 11-93 Waltner Corporation s management... Waltner Corporation's management reports that its average delivery cycle time
Marat540 [252]

Complete question is;

Waltner Corporation's management reports that its average delivery cycle time is 25 days, its average throughput time is 7.7 days, its manufacturing cycle efficiency (MCE) is 0.43, its average move time is 0.3 day, and its average queue time is 3.00 days. Required: a. What is the wait time?

b. What is the process time?

c. What is the inspection time?

Answer:

A) Wait time = 17.3 days

B) Process time = 3.311 days

C) Inspection time = 0.789 days

Step-by-step explanation:

A) we are given;

Delivery cycle time = 25 days

throughput time = 7.7 days

The formula for wait time is calculated from;

Delivery time = wait time + throughput time

So, wait time = Delivery time - throughput time

Wait time = 25 - 7.7 = 17.3 days

B) The process time is calculated from;

MCE = Process time/throughput time

So, process time = MCE x throughput time

We are given MCE = 0.43,thus, and we already know throughput time. Thus;

Process time = 0.43 x 7.7 = 3.311 days

C) The inspection time is gotten from;

throughput time = Process time + Inspection time + Move time + Queue time

Making inspection time the subject;

inspection time = throughput time - Process time - Move time - Queue time

Move time = 0.3 days

Queue time = 3 days.

Thus;

inspection time = 7.7 - 3.311 - 0.3 - 3.3 = 0.789 days

3 0
4 years ago
After being rejected for employment, Kim Kelly learns that the Bellevue Credit Company has hired only two women among the last 2
masha68 [24]

Answer:

Binomial Problem with n = 20  and p(hire woman) = 1/2

P(at most two) = binomial(20,1/2,2) = 0.0001811

Step-by-step explanation:

The probability of  successes in  trials where  is the probability of success on any given trial is given by:

 

5 0
4 years ago
Solve the problem shown above^^
malfutka [58]

Answer:

Step-by-step explanation:

Since the lengths of the shelves are given in cm and the answer is to be expressed in cm, then let's convert the length of the whole board from 2.5 m to cm. Since there are 100 cm in a m, then multiply 2.5 by 100 to get 250 cm. Now let's start with the expressions for the shelves. The lengths of all the shelves are based on the length of the first shelf. You can usually tell which object is the main one because it is mentioned the most number of times. The first shelf is mentioned 3 times so that is the main shelf that the measurements of all the other shelves are based upon. Let's call the first shelf x. The second shelf is 18 cm longer than twice the length of the first so the second shelf is 2x + 18.

The third shelf is 12 cm shorter than the first so the third shelf is x - 12.

The last shelf is 4 cm longer than the first shelf so the last shelf is x + 4. Since he needs to use all 250 cm of the board, we add all the shelves together and set them equal to 250 cm:

x + 2x + 18 + x - 12 + x + 4 = 250 and

5x + 10 = 250 and

5x = 240 so

x = 48. The first shelf is 48 cm long. But we need the length of the second shelf. The expression for the second shelf is 2x + 18, so 2(48) + 18 = 114 cm.

8 0
4 years ago
I need help on number 4?
olga nikolaevna [1]
They would have 2 because is it 10:1 just double it to be 20:2
8 0
3 years ago
Other questions:
  • Determine whether the underlined numerical value is a parameter or a statistic. explain your reasoning. upper a survey of 42 out
    10·1 answer
  • *WILL MARK BRAINLIEST*
    12·1 answer
  • At a carnival, the probability that you choose a winning rubber duck from 25 sucks is 0.24.
    12·1 answer
  • -7x + 6= 27 what does x stand for ?
    7·1 answer
  • -<br>3<br>The sum of<br>and its multiplicative inverse is​
    8·2 answers
  • I need this in final factored form! I’m a little stuck
    13·1 answer
  • • Here are some clues to a mystery number.
    7·2 answers
  • What shortcut would you use to prove the triangle congruent?
    14·1 answer
  • At 4:00am the outside temperature was -28 by 4:00pm.it had risen 38 degrees what was the temperature at 4:00pm
    14·2 answers
  • Please help i dont get it
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!