1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
harina [27]
3 years ago
13

How do I go to files in Brainly I need help

Computers and Technology
1 answer:
Lyrx [107]3 years ago
4 0

Answer:

There should be a little icon at the bottom of your question box/answer box. It looks like a paper clip. click it and boom

Explanation:

You might be interested in
Mary’s computer is running slow and will not load programs or videos. She has tried restarting her computer yet it is still not
luda_lava [24]
She shall not reset her computer because she will have to load every thing again
8 0
4 years ago
To remove an embedded chart, you should _____ it and press the DELETE key. (Points : 2) move drag hide click
Readme [11.4K]
I think the answer would be "click" 
3 0
3 years ago
Write an algorithm in pseudocode or english that would describe how to use a stack to reverse any list.
s2008m [1.1K]
Int data[n];
int rev[n];

for (i=0; i < n; i++)
     stack.push(data[n]);
for (i=0; i <n; i++)
     rev[i] = stack.pop();

3 0
3 years ago
Which of the following is not a step that must occur with every correctly working loop?
goblinko [34]

Answer:

b) Set the loop control value equal to a sentinel during each iteration.

Explanation:

Sentinel in the loops is the constant value that is used to stop the loop. So in each iteration, if you set the loop control value to the sentinel. The loop will stop working or the sequence of compiling will break out of the loop.

So setting the loop control value to the sentinel is not a correct step for properly working of the loop.

7 0
4 years ago
Read 2 more answers
Which statement best describes what a project manager controls
I am Lyosha [343]
Project controls are processes for gathering and analyzing project data to keep costs and schedules on track. The functions of project controls include initiating, planning, monitoring and controlling, communicating, and closing out project costs and schedule.
7 0
3 years ago
Read 2 more answers
Other questions:
  • in the breezy python gui module, what class provides the basic functionality for any window, such as the command buttons in the
    10·1 answer
  • What are some of the other operations that might be implemented for a queue?
    14·1 answer
  • CHALLENGE ACTIVITY 2.15.1: Reading and outputting strings. Write a program that reads a person's first and last names, separated
    11·1 answer
  • _____ refers to unsolicited commercial emails, usually sent to a large number of people with little regard to the users interest
    14·1 answer
  • Brian is selecting an authentication protocol for a PPP connection. He would like to select an option that encrypts both usernam
    7·1 answer
  • Type the correct answer in the box. In which phishing technique are URLs of the spoofed organization misspelled? _____ is a phis
    11·1 answer
  • Jamie is preparing a presentation on his laptop for his college annual event. He inserts audio and video files into the presenta
    11·2 answers
  • PHP is based on C rather than ______.
    5·1 answer
  • Explain the 2 types of network topology ​
    10·1 answer
  • The people on this platform are unbelievably nice. its almost rare to see this type of kindness online these days. Just wanted t
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!