Answer:
C. 2.4 degrees Fahrenheit
Step-by-step explanation:
1.1 per hour for 7 hours
1.1 x 7 = 7.7
5.2 - 7.7= -2.5
-2.5 + 4.9 = 2.4
Answer:
Dimension of room = 18 foot x 18 foot
Step-by-step explanation:
Let the square room is of side a foot,
The cost of re-finishing the hardwood floors is $2.25 per square foot and the cost of purchasing and installing the new baseboards $14.5 per linear foot
Total cost is $1773.
Cost for re-finishing the hardwood floors = Area x 2.25
Area = a²
Cost for re-finishing the hardwood floors = 2.25 a²
Cost of purchasing and installing the new baseboards = Perimeter x 14.5
Perimeter = 4a
Cost of purchasing and installing the new baseboards = 4a x 14.5 = 58 a
Total cost = Cost for re-finishing the hardwood floors + Cost of purchasing and installing the new baseboards
1773 = 2.25 a² + 58a
2.25 a² + 58a - 1773 = 0
a = 18 or a = -43.77(not possible)
Dimension of room = 18 foot x 18 foot
6.25 is probably the answer
Let's simplify step-by-step.<span><span>−<span>4.9x</span></span>+<span><span><span>(1.3)</span><span>(0.11)</span></span><span>(0.1)</span></span></span><span>=<span><span>−<span>4.9x</span></span>+0.0143
</span></span>Answer:<span>=<span><span>−<span>4.9x</span></span>+<span>0.0143</span></span></span>