</span>Closing costs<span> are fees paid at the </span>closing<span> of a </span>real estate transaction<span>. It is called the </span>closing<span> when the </span>title<span> to the property is </span>conveyed<span> to the buyer. Closing costs then are incurred by the buyer or the seller, either of the two.</span>
Answer:
The estimated rate based on labour hour==6
The actual rate based on labour hour=6.08
The rate based on machine hour=24
The rate based on machine hour= 22.66
Explanation:
Given that Carlson estimated its overhead costs to be $240,000,direct labor hours at 40,000 and machine hours at 10,000 as well as the actual overhead costs incurred of $249,280, actual direct labor hours of 41,000, and actual machine hours of 11,000.We can calculate the to apply .
The estimated rate based on labour hour=240000/40000=6
The actual rate based on labour hour=249280/41000=6.08
The rate based on machine hour=240000/10000=24
The rate based on machine hour=249280/11000=22.66
Answer:
The answer is: $29,000
Explanation:
To calculate Job A3B's costs during September we must add direct materials plus 3 times direct labor:
September costs = direct materials + (direct labor x 3) = $1,500 + $9,000
September costs = $10,500
We do the same for October:
October costs: direct materials + (direct labor x 3) = $2,000 + $16,500
October costs = $18,500
The total cost for Job A3B is: $10,500 + $18,500 = $29,000