Table F shows the proportional relationship.
All the x factors are being multiplied by 2.
If you need more help, let me know.
Brainliest answer would be appreciated.
Answer:
0.77
Step-by-step explanation:
From the information given:
The breakdown time (a)= 3 hours
The breakdown rate (λ) = 1/a = 1/3
Average flow time in the system (W) = 2.305 hours
For the entire system;
The average down machines L = Wλ
= 2.305 × (1/3)
= 0.77
Answer:
18.9271 liters
Step-by-step explanation:
i googled it
Answer:
its 66.96
Step-by-step explanation:
to find the area we do the length x height of the shape