Answer:

a) $4110
Step-by-step explanation:
Let x represent number of rain coats and C(x) represent total cost to produce new line of rain coats.
We have been given that the fixed costs of $570 to set up for production, and variable costs of $30 per jacket.
The cost of x jackets would be
.
The total cost of x jackets would be variable cost of x jackets plus fixed costs that is $570.
Therefore, the total cost of producing x rain coats would be
.
To find the total cost of producing 118 rain coats, we will substitute
in the above equation as:



Therefore, the total cost of producing 118 rain coats is $4110 and option 'a' is the correct choice.
Answer:
b 5800000 nqjaksn dicing oxidizing tochos toxicidad
Let's make this simple. Let's have the small cone have a radius 1 and the height 1. This would make the bigger
cone
have a radius of 1 and the height of 2.
With this information, lets get the volume of both cones. The formula is this:

Plug in numbers:
Small cone:

Big cone:

The small cone has a volume of

The big cone has a volume of

Now, you want to find how many small cones you need to have the same total volume of the big cone.

You have the difference of pi over 3 comparing the big cone to the small one. You realize that the small cone has the same volume of that. Therefore,
you need 2 small cones to have the same total volume as the larger cone
9514 1404 393
Answer:
no, it is good for 2 weeks (almost 3)
Step-by-step explanation:
The volume of the pool is ...
V = LWH
V = (20 m)(8 m)(1.8 m) = 288 m³
Then the amount of chlorine powder needed for 1 week is ...
(300 g/(50 m³)) × (288 m³) = 1728 g
A box of 5000 g holds enough chlorine for ...
(5000 g)/(1728 g/treatment) = 2.89 treatments
A box of chlorine powder is enough for 2 weeks, not 4.
Answer:
what is that i dont answering this sorry