Multiply 2x by each term in the parentheses:
2x(x - 3)
2x^2 - 6x
Answer:
2x^2 - 6x
Answer:
240 m³
Explanation:
The volume of a pyramid is equal to:

Where B is the area of the base and H is the height of the pyramid.
Then, the base of the pyramid is a triangle, so the area of a triangle is equal to:

Where b is the base of the triangle and h is the height of the triangle. So, replacing b by 16 m and h by 9 m, we get:

Finally, replacing B by 72 m² and H by 10 m, we get that the volume of the pyramid is equal to:

Therefore, the volume is 240 m³
Answer:
$10,249.80
Step-by-step explanation:
I'm really tired but if you want an explanation, please say so
Answer:
equation 1
y = -2x
equation 2
y = x-3
Solution to both
(1,-2)
Step-by-step explanation:
We need to get the equations of both lines
General form is;
y = mx + c
where m is slope and c is the y-intercept
Table 1
since we have a point 0,0; the y-intercept here is zero
Let us get the slope. We can do this by selecting any two points
m = (y2-y1)/(x2-x1)
m = (2-10)/(-1+5) = -8/4 = -2
So the equation of the first line is;
y = -2x
Table 2
we get the slope
m = (4+2)/(7-1) = 6/6 = 1
The partial equation is;
y = x + c
To get c, we select any two point and substitute
4 = 7 + c
c = 4-7
c = -3
So the equation is;
y = x-3
To get the solution to both systems, we equate the y
-2x = x - 3
-2x-x = -3
-3x = -3
x = -3/-3
x = 1
To get y, we substitute;
recall; y = -2x
y = -2(1)
y = -2
Solution to the system is;
(1,-2)
To solve for proportion we make use of the z statistic.
The procedure is to solve for the value of the z score and then locate for the
proportion using the standard distribution tables. The formula for z score is:
z = (X – μ) / σ
where X is the sample value, μ is the mean value and σ is
the standard deviation
when X = 70
z1 = (70 – 100) / 15 = -2
Using the standard distribution tables, proportion is P1
= 0.0228
when X = 130
z2 = (130 – 100) /15 = 2
Using the standard distribution tables, proportion is P2
= 0.9772
Therefore the proportion between X of 70 and 130 is:
P (70<X<130) = P2 – P1
P (70<X<130) = 0.9772 - 0.0228
P (70<X<130) = 0.9544
Therefore 0.9544 or 95.44% of the test takers scored
between 70 and 130.