Answer:
-8 and -4
Step-by-step explanation:
Answer:
4x-17=x/2+8
Step-by-step explanation:
Lets assume the whole pie is 1, that is all fractions added together have to sum 1.
If Victor eats 1/6 out of 5/6, then the rest is 4/6 of the pie, that is the subtraction of those fractions.
Answer:
70
Step-by-step explanation:
28 b y 2 14 times 5
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates