answer:
DirectX.
hopefully this is helpful.
The resource allocation section of the test plan contains the information regarding the features to be tested in the test plan.
<h3>What is resource allocation?</h3>
The distribution and disbursement of the total disposable resources within an organization towards the different functions and processes in an organization is referred to as resource allocation.
The main functionality of a resource allocation section in a test plan is to portray the features of the test that will be conducted by the team of experts.
Hence, the functions of resource allocation in a test plan are as aforementioned.
Learn more about resource allocation here:
brainly.com/question/17837067
#SPJ1
JOJO fan!?!!?!??!?!?!!?!?
Give the type and value of each result of the following Java expressions. a. (5 / 2) * 2.0 type is float value is 4.0 b. (5/2.0) * 2 type is integer value is 5c. "1.3" + "5.2" type is string value is 1.35.2d. 1 + 7.0 + "2" + "x" this will produce an error because we cannot add variables of different type
Question:
Within the sites that support disaster recovery, __________ is a separate facility that does not have any computer equipment but is a place where employees can move after a disaster.
A) disaster site
B) hot site
C) warm site
D) cold site
Answer:
The correct answer is answer is D)
Explanation:
A cold site is a business location that is utilised as a backup in the event of a disruptive operational disaster at the normal business site. A cold site is an office, but it does not always have the necessary equipment to resume prompt operations. The business paying for the cold site, provides and installs this equipment.
Cheers!