Answer:
It will take Machine A 20 additional minutes.
Step-by-step explanation:
First we have get the rate of work per hour, Machine A builds 1/2 of a car per hour, while Machine B builds 1/3 of a car per hour.
Using this we can determine the amount of work that has been done so far in one hour before Machine B broke down:
1/2 + 1/3 = 3/6 + 2/6 = 5/6
Now we can produce an equation accordingly to determine how much time it'll take machine a to finish the job:
5/6 + 1/2x = 1
1/2x = 1/6
x = 1/3 hours = 20 minutes
Note: In the question you typed "how much additional time will it take machine b to finish" but I think you meant machine a because machine b broke down. Please correct me if I'm wrong.
Hope this helps! And let me know if you have any questions!
Answer:
1/20 is 5%
Step-by-step explanation:
1/20 = 5%
20/20 = 100%
100 ÷ 20 = 5%
1/20 x 100 = 0.05 x 100 = 5%
Answer:
41/24 or 1 17/24
Step-by-step explanation:
2 3/8=19/8
-2/3+19/8
-16/24+57/24
41/24
Using Lagrange multipliers, we have the Lagrangian

with partial derivatives (set equal to 0)




Substituting the first three equations into the fourth allows us to solve for

:

For each possible value of

, we get two corresponding critical points at

.
At these points, respectively, we get a maximum value of

and a minimum value of

.