Answer:
w is 214656 z is 8657
hope this helps
Step-by-step explanation:
Answer: 455 mph
Step-by-step explanation:
if train one is traveling one way at 60mph, then you have to multiply that by 3.5 to see how far it traveled in that amount of time.
60 x 3.5 = 210
then, you have to multiply 3.5 by 70mph, to see how far the second train has traveled in that amount of time
70 x 3.5 = 245
finally, since both trains are moving in opposite directions, you have to add up the distances together to get the final difference
210 + 245 = 455
Answer:
13/4
Step-by-step explanation:
We do reciprocal of 1/13 it will be 13/1 after we multiply last answer 13/4
<h3>
Answer: 675</h3>
=========================================================
Explanation:
Start at $3.50 on the vertical y axis. Draw a horizontal line until you reach the supply curve. Then drop straight down to land somewhere between 650 and 700 units supplied per day. Check out the diagram below.
A good estimate may be to use the midpoint. Add up those values and divide in half.
(650+700)/2 = 1350/2 = 675
Therefore, we estimate that 675 sandwiches per day would be supplied if the price was $3.50 per sandwich.
It is located in the first or I quadrant