Answer:
The correct answer to the following question will be "True".
Explanation:
SCADA is a hardware and software elements program that permits industrial enterprises to:
- Agricultural processes are regulated locally or globally.
- The human-machine interaction program specifically interfaces with equipment such as cameras, switches, generators, motors and much more.
- Track, store, and process the data in real-time.
Therefore, the given statement is true.
Answer:
1. DBMS
C. <em>A storage system that provides efficient access to randomly chosen items</em>
G. <em>Performs database operations requested by application software</em>
2. data mining
B. <em>The process of extracting hidden information</em>
3. hash file
A. <em>A. means of locating a particular record within a file</em>
4. index key field
F. <em>An item used to identify records uniquely</em>
5. locking protocol
E. <em>A system to guard against database errors due to performing transactions concurrently</em>
6. relation
D. <em>A structural unit (with rows and columns) in a popular database model</em>
7. roll back schema
I. <em>A "road map" of a particular database's design</em>
J. <em>To "unwind" a transaction</em>
8. SQL
H. <em>A popular language that implements relational database operations.</em>
Answer:
use a wizard or use a design view
Explanation:
i took the test
Answer:
I said CLI.
Explanation:
''A command-line interface (CLI) processes commands to a computer program in the form of lines of text.''- Wikipedia
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.