Answer: it will take the faster computer 15 minutes to do the job on its own.
Step-by-step explanation:
Let t represent the number of minutes it will take the faster computer to do the job on its own. It means that the rate at which it does the job per minute is 1/t
If it takes the slower computer 30 minutes to do the job on its own. It means that the rate at which it does the job on its own per minute is 1/30
By working together, they would work simultaneously and their individual rates are additive. Working together it takes two computers 10 minutes to send out a company's email. It means that the rate at which both computers work together per minute is 1/10 Therefore,
1/t + 1/30 = 1/10
Cross multiplying by 30x, it becomes
3x = x + 30
3x - x = 30
2x = 30
x = 30/2
x = 15 minutes
If it is on sane for 25% off, that's the same as being on sale for 75% of the original price.
Multiply the original cost by 75% in decimal form.
30*.75=22.5
Final answer: $22.50
Answer:
293 miles
Step-by-step explanation:
284.58-17.95=266.63
266.63/0.91=293
293 miles
Given:
'a' and 'b' are the intercepts made by a straight-line with the co-
ordinate axes.
3a = b and the line pass through the point (1, 3).
To find:
The equation of the line.
Solution:
The intercept form of a line is
...(i)
where, a is x-intercept and b is y-intercept.
We have, 3a=b.
...(ii)
The line pass through the point (1, 3). So, putting x=1 and y=3, we get



Multiply both sides by a.

The value of a is 2. So, x-intercept is 2.
Putting a=2 in
, we get


The value of b is 6. So, y-intercept is 6.
Putting a=2 and b=6 in (i), we get

Therefore, the equation of the required line in intercept form is
.
5,456 I just did this question good luck