Answer:
240x is=f simplfied.
Step-by-step explanation:
Answer:
6 weeks=6*7 days=42days
7/42 =1/6 =0.16667
OR
7 days=1 week
therefore 1/6=0.16667
Note that both must be in the same unit.
Water-cement ratio is the ration of mass of water to the mass of cement.
Numerically it is around 0.5, depending on the desired strength and workability.
A low ratio results in a dry mix which is difficult to compact, with a risk of developing voids in the final concrete.
A high ratio weakens the concrete, and is highly undesirable if strength is important.
To improve both the strength and workability of the concrete, sometime plasticizers are added.
It would have been appropriate to post this question in the Engineering section (if one is available).
Answer:
So to find ratio for questions like these we do x/y
So the ratio for the first one is 5/7
The ratio for the second is 12/7 or 1 5/7
Step-by-step explanation: