- Critical Path Analysis is presented using the circle and arrow diagrams.
- Earliest Start Time = the earliest possible time of starting the activity
- An arrow running between two event circles shows the activity needed to complete that task.
- All arrows run left to right
- Time for doing just task E = 8 hours (as shown in the figure)
Answer:
Option B.
Step-by-step explanation:
The given vertices of the polygon are (-6,-2),(-5,1),(-1,4),(1,1),(5,3),(1,-2).
We need to find the area of the polygon.
Plot the given vertices and on a coordinate plane and draw the polygon. Divide the polygon in 4 parts as shown below.
Area of rectangle is
Area of triangle is
Area of each figure is
Area of polygon is
The area of polygon is 34.5 units².
Therefore, the correct option is B.
Answer:
Reflection
Step-by-step explanation: It is reflection because it is the same thing just reflected