1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Serhud [2]
3 years ago
13

Find the coordinates of the turning point for the equation of the graph below y=x^2+14x+45

Mathematics
1 answer:
USPshnik [31]3 years ago
4 0

Answer:

(- 7, - 4 )

Step-by-step explanation:

Given a quadratic in standard form

y = ax² + bx + c ( a ≠ 0 )

Then the x- coordinate of the turning point is

x = - \frac{b}{2a}

y = x² + 14x + 45 ← is in standard form

with a = 1, b = 14 , then

x = - \frac{14}{2} = - 7

Substitute x = - 7 into the equation and evaluate for y

y = (- 7)² + 14(- 7) + 45 = 49 - 98 + 45 = - 4

coordinates of turning point = (- 7, - 4 )

You might be interested in
Need help on answering 20.
Reptile [31]
N=64.
32+64=100
64/8=8
sqrt (64+225)= sqrt (289) = positive and negative 17
8 0
3 years ago
A Walgreens manager compared the numbers of hours different pharmaceutical technicians worked over one week. The table shows the
nataly862011 [7]
It is D because all the numbers range from 12 to 23, with no number being extremely low or high compared this range.
6 0
3 years ago
Read 2 more answers
O triplo de um número, menos 10 é igual ao próprio número mais 70. Qual é esse número?
marin [14]

Answer: 40

Step-by-step explanation:

3x-10=x+70

3x-x=70+10

2x=80

x=8<u>0</u>

    2

x=40

8 0
3 years ago
Read 2 more answers
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
3 years ago
Which statement best describes the point (2,-5)
LuckyWell [14K]
I believe your answer would be C. Hope this helped!
8 0
3 years ago
Other questions:
  • Which of the following questions is UNBIASED ?? A) Is soccer your favorite sport to wash ? B)Do you like watching boring sports
    6·1 answer
  • -104=-8(k+8) <br><br> K = ?<br> Solution please if can?
    9·1 answer
  • Please help!!!!
    11·1 answer
  • Carlos graphs the equations y = 0.5x2 + 3 and y = –4x2 + 24x – 35 and generates the graph below. Which conclusion is supported b
    8·2 answers
  • The table represents the height of a rock that is dropped, h(t), in meters, after t seconds.
    10·2 answers
  • 5) Jim is hoping that a park will be built
    7·1 answer
  • Hayden has 90 trading cards
    5·1 answer
  • 15 4/7 - 11 ⅖=???????
    6·1 answer
  • Which number produces an irrational number when added to 0.4?<br> B. 0.444...<br> C.2/7
    11·1 answer
  • The residence of a city voted on whether to raise property taxes the ratio of yes votes to know votes was 5 to 6 if there was 58
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!