<span>You are given a a graph titled Plant Height that shows Number of Weeks on x axis and Height of Plant in cm on y axis. Plotting this and you will get an equation of y = 1.2792x - 0.1665 (I used excel using the given points from the above problem).
</span>y = 1.2792x - 0.1665
y = 1.2792 (7) - 0.1665
<span>y = 8.78 centimeters.
The most likely approximate height of the plant after 7 weeks is 8.7 centimeters.
</span>
Answer:
6x + 4 - 1/100 = 77.5
Step-by-step explanation:
Inc shipping all shirts 77.49
Shirt individual cost = 12.25
We find the division first = 77.49-3.99 = 73.5 = 73 1/2
Then we divide 73.5 / 12.25 = 6
Then we have our equation
6x + 4 - 1/100 = 77.5
The division is using extra zeros.
2 * 16 = 32, but 3200 was placed below 3426.
Now 1 * 16 = 16, so 160 goes below 226.
The number that goes in the box is 160.
Answer:
<em>2.5 hours</em>
<u>Skills needed: Speed, distance, time problems</u>
Step-by-step explanation:
1) We are given speed and distance, and have to find out the the time (in hours).
- In terms of units, everything is matched up (Since distance and speed use kilometers, and speed and time use hours).
- Time is always the distance you travelled (how far) divided by how fast you travelled (the rate/speed)
---> We can use the formula for time: 
t= time
d=distance
r=rate/speed
2) Now, let's plug in for distance and rate.
---> 
2.5 hours is the answer.
3.65 x 10^5 <==== scientific notation