1 is 384cm you multiply the 96 by 4 (because there is 96 4 times)
If I’m incorrect I’m sorry
Answer:
20736
Step-by-step explanation:
xy^4 = z
x=4 , y=3
(4*3)^4=z
12^4=z
z=20736
Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
5353 minutes = 89.22 hours
Maybe the figures should be 53 and 20??
Let's let Billy = A
The formula to use for work problems is
Time = (A*B) / (A+B)
53 = ( (A +20)* A) / (A +20 + A) )
53 = ( A^2 + 20A ) / (2A + 20)
A^2 + 20A -106A -1060
A^2 -86A -1060
A = 96.935
Bobby Mows in 116.935 minutes
We are told that f(1) = -1.5, and that f(n+1) = -2f(n).
Then: f(2) = -2f(1) = -2(-1.5) = +3 (answer)