Answer:
3. x+8
4. 6y
5. 1/2m
6. 50/h
7. 7-n
8. 15+x
9. 2t/12
10. p² -3
11. 2k-7
12. 3(w+5)
13. C
14. The error was it was written that you would subtract the pages read by pages in the article which is incorrect. You would subtract pages total (5) by pages read (p). So it is 5-p.
15. 4v
16. 16/p
17. 2.97/p
18. 20+j
19. 7-d
20. m/60
21. y/12
22. unit rate-8
23. unit rate-1.5
24. unit rate-2.4
25. unit rate-6.8
26. C
There would be a hole when x = -4.
If you factor both the top and the bottom, you will see that the factor (x + 4) is in both the numerator and denominator. Therefore, the would be a hole when x = -4 because that would also make the denominator 0.
Answer:
600 miles.
Step-by-step explanation:
So basically we can write both plans as linear functions:
F(x) = $59.96+$0.14 . x
S(x) = $71.96+$0.12 . x
Where F(x) is the first plan, S(x) is the second one and X are the miles driven.
To know how many miles does Mai need to drive for the two plans to cost the same, we equalize both equations and isolate x.
F(x) = S (x)

Mai has to drive 600 miles for the two plans to cost the same-
Answer: 0.24 +/- 0.088 = (0.152, 0.328)
Step-by-step explanation:
The point estimate p is given by;
p= 24/ 100 = 0.24
Z value for 96% confidence interval is 2.05
The solution for the given confidence interval is derived using the equation
p +/- z√(pq/n)
Where p = 0.24 q= 1-p = 0.76, n=100 z= 2.05
= 0.24 +/- 2.05√(0.24×0.76/100)
= 0.24 +/- 2.05(0.0427)
=0.24 +/- 0.088
= ( 0.152, 0.328)