1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Tanzania [10]
3 years ago
15

The data are from a small moving company that moves people from urban apartment buildings to other urban apartment building in t

he same or different cities. The company needs assistance in predicting the labor hours for jobs so they can provide more accurate price quotes.
Run two separate regressions using the data in the sections of the spreadsheet titled Regression Model 1 and Regression Model 2. Use a 95% confidence level.
Fill in all the blanks below. Do not round any numbers except for when entering them in the blanks for this quiz, round these numbers to exactly 2 decimal places even if the number has only one or no decimal places. Use commas to separate thousands (e.g., 1225 should be entered as 1,225.00).
Regression Model 1
R Square expressed as a percentage rounded and carried out to two decimal places is ________% and Adjusted R Square expressed as a percentage rounded and carried out to two decimal places is _______%. Refer to the spreadsheet embedded in your Module 14 Regression document I provided you to see the calculation and format for answering this next question. The gap between R Square and Adjusted R Square expressed as a percentage rounded and carried out to two decimal places is 0.______%.
The overall regression model (was / was not) _______ significant.
Using square footage of 1,500 and mileage of 92, the model estimates that ______ hours of labor would be required, with a margin of error of _________ hours.
Regression Model 2
R Square expressed as a percentage rounded and carried out to two decimal places is _______% and Adjusted R Square expressed as a percentage rounded and carried out to two decimal places is _______%. Refer to the spreadsheet embedded in your Module 14 Regression document I provided you to see the calculation and format for answering this next question. The gap between R Square and Adjusted R Square expressed as a percentage rounded and carried out to two decimal places is 0.________%.
The overall regression model (was / was not) __________ significant.
Using square footage of 1,500, mileage of 92, and floors of 71, the model estimates that _________ hours of labor would be required, with a margin of error of ________ hours.
Model Selection
Because the R Square is (higher / lower) _________ in regression model 1 than in regression model 2 and the gap between R Square and Adjusted R Square is (smaller / larger) in regression model 1 than in regression model 2 _________ and the margin of error of the estimated labor hours is (smaller / larger) _________ in regression model 1 than in regression model 2 , we would characterize regression model (1 or 2) ___________ as being the better model.
Mathematics
1 answer:
Elenna [48]3 years ago
3 0

Answer:

I wish I can read all the text

You might be interested in
Use the Venn diagram to list the set of elements of A ∩ B in roster form.
artcher [175]

Answer:

A. {e, h}

Step-by-step explanation:

In a Venn diagram, the set of elements in any intersection can simply be visualised. The elements contained in the region where the circles representing different sets overlap, are the set of elements of intersection.

In the Venn diagram given, the set of elements contained in the region where the circles representing A and B overlap are {e, h}.

{e, h} is common to both set A and set B.

7 0
3 years ago
Choose the graph of the solution to this inequality. <br> c-12&gt;-16
malfutka [58]

Answer:

Option A

Step-by-step explanation:

c - 12 > - 16

c > -16 + 12

c > -4

7 0
4 years ago
How can I do this problem?
Airida [17]

Answer:

39

Step-by-step explanation:

65/2.5 then x 1.5

4 0
3 years ago
Read 2 more answers
Line XY bisects and is perpendicular to AB and CD. CD = 10 and XY = 24. What is the length of AP?
myrzilka [38]

Answer:

<u>AP = 13</u>

Step-by-step explanation:

See the attached figure.

CD = 10 and XY = 24

Line XY bisects and is perpendicular to AB and CD

∴ XY bisects at Y

∴ CY = 0.5 CD = 0.5 * 10 = 5

And from the geometry of the shape

P is the midpoint of XY

∴ XP = YP = 0.5 XY = 0.5 * 24 = 12

XY is perpendicular to CD

∴ ΔPYC is a right triangle at Y

∴ PC (hypotenuse) = \sqrt{PY^2+YC^2} =\sqrt{12^2+5^2}=\sqrt{144+25} =\sqrt{169} =13

From the figure AP = PC = 13

8 0
3 years ago
8(6k+6)=-3k-3. Help please
Sphinxa [80]

Answer:

Step-by-step explanation:

48k+48=-3k-3

48k+45=-3k

-51k=-3

solving for k

.0588 or .059

7 0
3 years ago
Read 2 more answers
Other questions:
  • What is the midpoint of the segment shown below?<br> Help me plz
    8·1 answer
  • A huge ice glacier in the Himalayas initially covered an area of 454545 square kilometers. Because of changing weather patterns,
    11·1 answer
  • What is the quadratic function that is created with roots -3 and 1 and a vertex at (-1, -8)
    5·1 answer
  • The graph of which equation has the same slope as the graph of y=4x+3? *
    7·1 answer
  • I am stuck on this one and its due tomorrow! Please help
    8·1 answer
  • Swimsuit discounted 65% on sale for $20.30
    15·1 answer
  • AHHHH HELP PLEASE, IT’S URGENT!!!!! I DON’T HAVE MUCH TIME :((( 7th Grade!!!!
    11·1 answer
  • HELP PLEASE!! Function G is a transformation of the parent exponential function. Which STATEMENTS are true about function g.
    13·1 answer
  • 7 a) The table shows the masses of the planets in our solar system.
    10·1 answer
  • What is 3/2+ t = 1/2
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!