Answer:
(-1, -5)
Step-by-step explanation:
When you graph the points, you find that the lines intersect at the point (-1, -5). That is the solution to the system of equations.
(x, y) = (-1, -5)
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
OH THANKS A LOT AND ITS 11
Answer:

Step-by-step explanation:
If you divide
by 4 (both numerator and denominator)
You get
which is equivalent to the given ration
Answer:
Step-by-step explanation:
1+2=3
3/2
1.5 AKA your answer
:)