Answer: Chris ran 20 miles more then Bill
Step-by-step explanation:
25(Chris) - 5(Bill) = 20 Miles
Hope this helped, have a great day/night!
~IFoundJiminsLostJams~
Answer:
132 tiles
Step-by-step explanation:
Each tile cost $4
The adhesive/grouting material costs $17.82.
If the contractor pays a total of $545.82
Let the number of tiles be represented as x
The equation is represented as:
$17.82 + $4 × x = $545.82
17.82 + 4x = 545.82
Collect like terms
4x = 545.82 - 17.82
4x = 528
Divide bother sides by 4
4x/4 = 528/4
x = 132
The number of ceramic tiles the contractor bought = 132 tiles
Answer:
12 hours
Step-by-step explanation:
since she is working at a constant rate of 4 hours for every 3 minutes and video is 9 minutes 9/3 is 3 and 4x3=12
Answer:
6.2 units.
Step-by-step explanation:
We are given two angles and an opposite corresponding side. To solve for an unknown side, we can use the law of sines.

Cross multiplying and solving will get you this:

Which can simplify to:

Which putting into a calculator gets you:

So the line PR is 6.2 units long.
A)
A=20(1.25^t)
C=25+10t
b)
A(4)=20(1.25^4)≈48.82≈49 alligators to nearest whole alligator
C(4)=25+10(4)=65 crocodiles.
c)
20(1.25^t)=25+10t
1.25^t=1.25+0.5t
t≈7