<span>
The most common source of business system failure is : B ) data quality
-Hope this helps.</span>
Answer:
C = 0.05*x + 34
Explanation:
There are several ways to approach this problem. However, we will follow a logical and simple procedure.
It is always possible to write any linear equation as:
y = mx + b, where:
m = slope
b = y-intercept (value when x = 0)
The problem statement guarantees us that b=34, because if we do not drive any mile (x=0), then the cost should be equal to $ 34. Also, we know that m=0.05, because every driven mile (increase in x by 1) the cost should increase by $5. Therefore, we can write the linear equation as:
y = 0.05x + 34
Changing the dependent variable y for C (to relate it with the cost) we have that:
C = 0.05x + 34
Answer:
Results are below.
Explanation:
Giving the following information:
Predetermined overhead rate= $18.00 per direct labor-hour
Direct labor wage rate= $12.00 per hour.
Job A-500
Direct materials $220
Direct labor $60
<u>First, we need to calculate the direct labor hours:</u>
Direct labor hours= 60/12= 5
<u>Now, we can allocate overhead:</u>
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
Allocated MOH= 18*5
Allocated MOH= $90
<u>Finally, the unit cost:</u>
<u></u>
Total cost= 220 + 60 + 90= $370
Unit cost= 370/60
Unit cost= $6.17
I took the test. The answer is A. Accounts Receivable for $530.
Brainliest please?