Answer:
a) 10 = X + Y
b) X = 1, Y = 9
X = 2, Y = 8
X = 3, Y = 7
X = 4, Y = 6
X = 5, Y = 5
i) The inputted values of X and Y are the solutions of the equation because they sum up to the 10 songs on Nyla's playlist.
Step-by-step explanation:
The given parameters are;
The number of songs in the playlist on her phone = 10
The number of authors of the songs on her playlist = 2
The equation that represent the situation is given as follows;
X + Y = 10
Where X represent the number of Beyonce's song on her playlist and Y represent the number of Jennifer Lopez's song on her playlist
b) 5 possible solutions are;
X = 1, Y = 9
X + Y = 1 + 9 = 10
Which gives 1 Beyonce's and 9 Jennifer Lopez's songs
X = 2, Y = 8
X + Y = 2 + 8 = 10
Which gives 2 Beyonce's and 8 Jennifer Lopez's songs
X = 3, Y = 7
X + Y = 3 + 7 = 10
Which gives 3 Beyonce's and 7 Jennifer Lopez's songs
X = 4, Y = 6
X + Y = 4 + 6 = 10
Which gives 4 Beyonce's and 6 Jennifer Lopez's songs
X = 5, Y = 5
X + Y = 5 + 5 = 10
Which gives 5 Beyonce's and 5 Jennifer Lopez's songs
i) The inputted values of X and Y are the solutions of the equation because they sum up to the 10 songs on Nyla's playlist.
Answer:
a, ax3 =b, bx3= c , cx3=d, dx3=e
Step-by-step explanation:
2, 2×3=6, 6x3=18,18 x3 =54, 54x3= 162
Multiplication of three with previous number will give you next number in series.
Answer:
765 J
Step-by-step explanation:
We are given;
Mass of bucket = 30 kg
Mass of rope = 0.3 kg/m
height of building= 30 meter
Now,
work done lifting the bucket (sand and rope) to the building = work done in lifting the rope + work done in lifting the sand
Or W = W1 + W2
Work done in lifting the rope is given as,
W1 = Force x displacement
W1 = (30,0)∫(0.2x .dx)
Integrating, we have;
W1 = [0.2x²/2] at boundary of 30 and 0
W1 = 0.1(30²)
W1 = 90 J
work done in lifting the sand is given as;
W2 = (30,0)∫(F .dx)
F = mx + c
Where, c = 30 - 15 = 15
m = (30 - 15)/(30 - 0)
m = 15/30 = 0.5
So,
F = 0.5x + 15
Thus,
W2 = (30,0)∫(0.5x + 15 .dx)
Integrating, we have;
W2 = (0.5x²/2) + 15x at boundary of 30 and 0
So,
W2 = (0.5 × 30²)/2) + 15(30)
W2 = 225 + 450
W2 = 675 J
Therefore,
work done lifting the bucket (sand and rope) to the top of the building,
W = 90 + 675
W = 765 J
Answer:
x=3
Step-by-step explanation:

Cross mutiply and x is equal to 3
Answer:
NO STOP NERD
Step-by-step explanation: