Answer:
Charges current production cost directly to work-in-process inventory
Explanation:
The blackflush costing is the costing method in which the present cost of production would be charged to the work in process inventory in a direct way
Therefore as per the given situation the second option is correct
ANd, the rest of the options are wrong as it does not meet the criteria
So the second option would be taken into consideration
Answer:
A. III only
Explanation:
One of the very useful tools in project management analysis is the PERT and CPM.
PERT (Program evaluation and review technique) provides valuable information regarding which activities need to be closely watched.
While CPM (Critical Path Method) helps in determining the time required to complete each task, and the minimum time required to complete a project.
Both CPM and PERT serve similar purposes by helping to determine projects or activities that need to be watched closely.
Answer:
it decreased
Explanation:
the graph shows that the line went down therefore showing it decreased