1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ratling [72]
2 years ago
14

I don’t understand question b can somebody explain it for me?

Mathematics
2 answers:
zzz [600]2 years ago
6 0
9.5 minutes because if she ran 2 miles in 19 minutes you would divide them both by 2 and 19/2=9.5
amid [387]2 years ago
4 0
If Gabrielle takes 19 minutes to run 2 miles then how much time does he take to complete 1 mile.

The above is the ‘b’ question.

We can get to know who long he takes to complete 1 mile taking the mean of the two in the double number line.

In this case it would be, the mean if 2 to get 1 and the mean of 19,

The mean of 2 is,

2miles / 2 = 1 mile.

And the mean of 19 mins is,

19 mins / 2 = 9.5 mins.

Hence, Gabrielle takes 9.5 mins to complete 1 mile.

Hope this helps you. Plz let me know if you have any doubts.

You might be interested in
3. Consider the equations 8 + x = n.
Scrat [10]
If n is a negative number, x would be less than -8.
3 0
2 years ago
A refund of $3.15 on a $8.64 bill
Varvara68 [4.7K]

8.64 - 3.15 = $5.49 if this is what you are asking

5 0
3 years ago
Read 2 more answers
If each pie serves 6 people and there were 22 people at dinner, how many pies exactly, (like a decimal), would feed them?
natulia [17]
22/6=03.666

the answers 03.666

6 0
3 years ago
the height of a triangle is 4x inches and the base is (5x+1) inches. the area of a triangle is 500 square inches. what are the d
marin [14]
You mean what x is? Please add more detail.
8 0
3 years ago
cehgg A costing system that first assigns costs to activities and then to products is a.job-order costing. b.activity-based cost
Ronch [10]

Answer:b.activity-based costing.

Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.

THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.

8 0
3 years ago
Other questions:
  • Why is the percent increase from 45 to 75 not equal to the percent decrease from 75 to 45
    13·1 answer
  • Write an expression that is equivalent to 7\8
    6·2 answers
  • The height of a standard doorway in a home is 80 inches. What is the metric equivalent in centimeters?
    14·1 answer
  • 15x+2x can be written as ____.
    12·2 answers
  • In a drive-in fast food restaurant, customers form a single lane, place their order and pay their bill at one window, and then p
    7·1 answer
  • What is the equation of a line with a slope of ​3​ and a point (3, 1) on the line?
    6·1 answer
  • There are 160 pages in a book.15% of the pages having pictures on them. How many
    5·2 answers
  • Find the area for each trapezoid.​
    9·1 answer
  • Two Boys are building a skateboard ramp. They want the ramp to be 3 feet tall and 5 feet long. One of them thinks that they can
    10·1 answer
  • Factor 1/3 out of 1/3p-2/3
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!