Answer:
I'd use a Non-probability Sampling Method.
Explanation:
The question is already laced with criteria - Heights of Buildings in New York.
This means that there are certain buildings that won't fit in the sample. In a non-probability sample, objects or subjects are elected based on specified criteria that are not random. This means that not all objects/subject have a c<em>hance</em> of being included in the sample.
It is assumed that the question/assignment centers around high rise buildings.
Therefore, one storey buildings and bungalows that are within and outside New York will not be included in the sample.
Under the Non-Probability Sampling Method, it is essential to note that there are other subgroupings of sampling techniques. They are:
- Convenience Sample
- Voluntary Sample
- Purposive Sample
- Snowball Sample
Cheers!
Answer:
The value of x is
.
Step-by-step explanation:
It is given that the inverse variation equation is
..... (1)
The value of y is 4 and the value of k is 7.
Substitute y=4 and k=7 in equation (1).

Divide both sides by 4.


Therefore the value of x is
.
The answer is 96 min, here is why:
x / 240 + x / 160 = 1
<span>2x + 3x = 480 </span>
<span>5x = 480 </span>
<span>x = 96 min
(</span><span>Drainage rate of first pipe = 480000/240 = 2000 l/min </span>
<span>Drainage rate of second tube = 480000/160 = 3000 l/min </span>
<span>Combined drainage rate = 5000 l/min </span>
<span>Time to drain = 480000/5000 = 96 min. )</span>
Answer:
6 by 8 or ( -4. 4)
Step-by-step explanation:
because that the answer
Answer: 144ft
Step-by-step explanation: Hope this help :D