Let's solve your equation step-by-step.<span>17=<span><span>3<span>(<span>g+3</span>)</span></span>−g</span></span>
Step 1: Simplify both sides of the equation.<span>17=<span><span>3<span>(<span>g+3</span>)</span></span>−g</span></span><span>
Simplify: (Show steps)</span><span>17=<span><span>2g</span>+9</span></span>
Step 2: Flip the equation.<span><span><span>2g</span>+9</span>=17</span>
Step 3: Subtract 9 from both sides.<span><span><span><span>2g</span>+9</span>−9</span>=<span>17−9</span></span><span><span>2g</span>=8</span>
Step 4: Divide both sides by 2.<span><span><span>2g</span>2</span>=<span>82</span></span><span>g=4</span>
Answer:<span>g=<span>4</span></span>
Answer:
S(x) = x² + 390224/x
Step-by-step explanation:
Volume of the open box = V = 97556 cm³
Material needed:
Let´s call x the side of the square base then the area of the base is
A(b) = x²
For the sides of the box, we have 4 sides each one with area of x*h
where h is the height of the box
The volume of the box V(b) = 97556 = x²*h then h = 97556/x²
S(x,h) = x² + 4*x*h*
The surface area of the box as function of x is:
S(x) = x² + 4*x*97556/x²
S(x) = x² + 390224/x
Answer:
12/5hours=2.4 hours
Step-by-step explanation:
Sam:6hours
Tom:4hours
This is a rate problem
Sam's rate is one job completed in 6 hours which is 1/6
Tom's rate is one job completed in 4 hours which is 1/4
Together, they could complete 1/4+1/6 of the job in y hours
We are trying to find the rate at which Sam and Tom could complete the job together, or one job in x days, for a rate of 1/y
1/4+1/6=1/y
The least common denominator is 12y
Multiplying through by the LCD which gives:
12y(1/4)+ 12y (1/6)= 12y (1/y)
3y + 2y=12
5y = 12
y=12/5 hours=2.4hours
Therefore it will take 12/5 hours or 2.4 hours to complete the job if they work together
I think answer should be e. Please give me brainlest let me know if it’s correct or not okay thanks bye I appreciate it
Answer:
6 cm
Step-by-step explanation: