Answer:
He needs to score below 68.88 in order to advance to the next round
Step-by-step explanation:
Z-score
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
He needs to score below what value in order to advance to the next round?
Below the 20th percentile, so below the value of X when Z has a pvalue of 0.20. So it is X when
He needs to score below 68.88 in order to advance to the next round
Answer: It Diego i think please don’t be mad at me if you get it wrong
so we have 3 folks painting 4 walls, now each one of them works for 32 minutes
person 1............. 32 mins
person 2............. 32 mins
person 3............. 32 mins
for a total of 32+32+32 = <u>96 minutes worth of work</u>. That's for 4 walls, how many minutes worth is just 1 wall?
96 ÷ 4 = 24 mins.
so to paint a wall, it takes 24 mins of work worth.
so then, to paint 7 walls, that'd be 7 * 24 = 168 minutes worth of work.
what about for 4 folks doing it? How many times does 4 go into 168? 168 ÷ 4 = 42 mins.
I believe the answer is they are drawing an Octagon because a polygon has 5 sides add that by three it's an Octagon