1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alekssandra [29.7K]
2 years ago
5

Manufacturing product designs must be tested before they are put into production. Who is responsible for this?

Computers and Technology
1 answer:
hammer [34]2 years ago
4 0

For testing the designs of the product prior to putting it into production, mechanics should be responsible for the same.

The information related to the mechanics engineers is as follows:

  • They are responsible for manufacturing & designing of machines & products.
  • It is the engineering branch.
  • Moreover, they are fully responsible for developing things.

Thus we can say that for testing the designs of the product prior to putting it into production, mechanics should be responsible for the same.

Learn more related to the production here: brainly.com/question/22852400

You might be interested in
What behaviors are most common in a successful entrepreneurship
Kryger [21]
1. Proper planning
2. Honesty
3. Being reasonable in pricing
4. Knowledge of what you’re offering
5. Being kind/good to your clients
8 0
3 years ago
Create a poem about MS powerpoint presentation
iren2701 [21]
You could use poem generator online or see samples and change some words
5 0
3 years ago
Which of the following is not regression test case? A. A representative sample of tests that will exercise all software function
AveGali [126]

Answer:

D. Low-level components are combined into clusters that perform a specific software sub-function

Explanation:

Normally, regression testing are done on a manual basis by simply re-executing a subset of the entire available test cases or it can be done automatically by utilizing playback tools or automated capture. Hence, from the options, a combination of low-level components into clusters that perform a specific sub-function does not align with how regression testing are done either manually or automatically.

6 0
3 years ago
In short and brave what is technology?
emmainna [20.7K]

Answer:

technology is a whole means to provide goods needed for the survival and comfort of human life

8 0
3 years ago
Read 2 more answers
What is the decimal equivalent of 11BA?
allsm [11]

Answer:

To convert hexadecimal number 11BA to decimal, follow these two steps:

Start from one's place in 11BA : multiply ones place with 16^0, tens place with 16^1, hundreds place with 16^2 and so on from right to left

Add all the product we got from step 1 to get the decimal equivalent of 11BA.

Using the above steps, here is the work involved in the solution for converting 11BA to decimal number (Don't forget that we start from ones place to so on...)

Decimal equivalent of "A" = (A) 10 × 16^0 = 10

Decimal equivalent of "B" = (B) 11 × 16^1 = 176

Decimal equivalent of "1" = 1 × 16^2 = 256

Decimal equivalent of "1" = 1 × 16^3 = 4096

Decimal equivalent of "11BA" = 409625617610

11BA = 4538

Here is the final answer, The hexadecimal number 11BA converted to decimal is therefore equal to:

4538

4 0
2 years ago
Other questions:
  • Which are the best examples of costs that should be considered when creating a project budget?
    11·1 answer
  • TLO 06 Active Directory Domain and Trusts tool is used to move servers between site in an AD Infrastructure.a. Trueb. False
    14·1 answer
  • What are the types of hypervisiors ?
    5·2 answers
  • Edhesive 8.5 code Practice help me pls
    15·1 answer
  • When using the Photo Album dialog box, a picture
    13·2 answers
  • Give 5 examples for software ​
    9·1 answer
  • Reflection about information technology​
    11·1 answer
  • Assignment 10 - 1/0 Streams and Files Create a C++ a program that will compute the average word length (average number of charac
    13·1 answer
  • What technology does kroger’s edge technology and amazon’s just walk out technology leverage?.
    15·1 answer
  • After a group sets a project schedule, members should be prepared to
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!