Answer:
B. a cross-functional approach to introduce new products to market.
Explanation:
Concurrent engineering -
It is a long term business strategy .
In this method the products designed and developed in different steps , is referred to as concurrent engineering .
The method is used to reduce the development time of the product and the marketing time of the product , which in turn increases an improves the productivity as well as decreases the cost .
Hence , the correct option is B.
Answer:
Dr Unearned fees $24,510
Cr Fees earned $24,510
Explanation:
Preparation of the December 31 adjusting entry required
Based on the information given if the balance shown in the unearned fees account was the amount of $37,040 before adjustment at the end of the year which means that if the amount of unearned fees at the end of the year is the amount of $12,530 the December 31 adjusting entry required will be :
Dr Unearned fees $24,510
Cr Fees earned $24,510
($37,040-$12,530)
Answer:
Underapplied= $75000
Explanation:
Giving the following information:
Carlisle Manufacturing expected Job No. 16 to cost $450,000 of overhead, $750,000 of materials, and $300,000 in labor.
Carlisle applied overhead based on direct labor cost.
Actual production:
Overhead cost =$420,000.
Direct materials= $825,000.
Direct labor= $330,000.
First, we need to calculate the overhead rate
Overhead rate= 450000/300000= 1.5 direct labor
Overhead according to rate:
330000*1.5= $495000
Real overhead= $420000
Underapplied= $75000
1 current taxes
It is a known factor and all of the other factors are unknown
Answer:
Assuming that no changes happened, 2020 sales and expenses should be similar to 2019's:
Total Per unit
Total sales $1,842,400 $28
Variables costs <u>($1,184,400)</u> <u>($18)</u>
Contribution margin $658,000 $10
Fixed costs <u>($498,000)</u> <u>($7.57)</u>
Operating income $160,000 $2.43