It is 4 as you can see every y in the table is 4 time bigger than x.
Answer:
g(x) = -x² - 4
Step-by-step explanation:
In this case, we are only changing <em>a </em>(reflection and vertical shrink/stretch) and <em>k </em>(vertical movement)
<em>k </em>= -4 because we are moving 4 units down
<em>a </em>= -1 because we are just reflecting over the x-axis
56 hr an 40 min because 34+21=55+1hr from 3half+3half=1hr and 10min+30min will be 40 min its 55hr 40min.
39 + 0.16m = 25 + 0.24m
39 - 25 = 0.24m - 0.16m
14 = 0.08m
14 / 0.08 = m
175 = m <=== they will cost the same at 175 miles
39 + 0.16(175) = 39 + 28 = $ 67
25 + 0.24(175) = 25 + 42 = $ 67
they will both cost $ 67 <=====
Answer:
6 =t
Step-by-step explanation:
-9 (t – 2) = 4(t – 15)
Distribute
-9t +18 = 4t -60
Add 9t to each side
-9t +18+9t = 4t+9t -60
18 = 13t -60
Add 60 to each side
18+60 = 13t-60+60
78 = 13t
Divide each side by 13
78/13 = 13t/13
6 =t