1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
asambeis [7]
3 years ago
15

you rent x pair of shoes for $2 each you buy the same number of drinks for $1.50 each you also pay $9 for a bowling lane

Mathematics
1 answer:
Tamiku [17]3 years ago
4 0
If you're trying to write out an equation for it, it should look like this y=$3.50x+$9
You might be interested in
Can you help me with this ​
nordsb [41]

Answer:

A=168 ft²

Step-by-step explanation:

18×8=144

0.5*8*6=24

24+144=168

8 0
3 years ago
Good at graphing coordinates? I need some help on that please!
ohaa [14]
Here are the coordinates :)

4 0
3 years ago
A cyclist is travelling at an average speed of 24km/h.
netineya [11]

Answer:

The answer is: 1. 5 minutes and 2. 133.3 meters

Step-by-step explanation:

To find how long it takes the cyclist to travel 2km at 24km / hour, set up the equation and cross multiply:

2 / 24 = x / 1

24x = 2

x = 2/24 = 1/12 of an hour or 60 / 12 = 5 Minutes.

To find how far he travels in 20 seconds:

Multiply 24 km by 1000 to get meters per hour. Divide by 3600 to get meters per second:

24000 / 3600 = 6.6 meters per second.

Multiply by 20 seconds to get the distance traveled in 20 seconds:

6.6 * 20 = 133.3

3 0
3 years ago
Please help me with this geometry question!!!!!!!!!!!!!!!!!
avanturin [10]
The answer is 225.19 mm since you convert the 11.2 cm to mm which is 112mm and then use the equation pi x r^2 x h
6 0
3 years ago
Read 2 more answers
The first bricklayer can build a wall in 15 days, the second bricklayer can build the same wall in 20 days. How long will it tak
Ugo [173]

Answer:

It takes <u>8  4/7 </u>days for both bricklayers to build the wall together.

Step-by-step explanation:  

The first bricklayer takes 15 days to build the wall, which means it builds 1/15 of the wall per day.

The second bricklayer takes 20 days to build the wall, which means it builds 1/20 of the wall per day.

So if they build the wall together, the expression below will tell how much of the wall they build per day together.

1/15 + 1/20

To add the fractions, we must find a common denominator, which is 60.  

4/60 + 3/60, which equals 7/60.

So, they can build 7/60 of the wall per day together.  How many days will it take them?  We must find how many times 7 fits into 60, which can be done by solving 60/7, which is 8 4/7.  

So, it takes 8 4/7 days for both bricklayers to build the wall together.

7 0
3 years ago
Other questions:
  • David wants to hang a mirror in his room. The mirror and frame must have an area of 8 square feet. The mirror is 2 feet wide and
    13·1 answer
  • (g(1) = 0<br> 9(2) = 5<br> ( g(n) = g(n-2) +g(n-1)<br> g(3)=
    13·1 answer
  • Which statement describes the changes that were made to the graph of f to make the graph of g
    13·1 answer
  • PLEASE HELP ASAP!! an onion soup recipe calls for 3 2/3 cups of chopped onions. katrina has already chopped 1 1/3 cups of onions
    14·1 answer
  • A triangle has an area of 100 square centimeters and a height of 10 centimeters. What is the length of the base?
    9·1 answer
  • Can someone help me please!
    12·1 answer
  • A Traveller changed EC $1800 to Barbados currency. Calculate the amount received
    10·1 answer
  • Please help me i don't understand. I will give points for explanation too.
    14·2 answers
  • Can you plz help me with this
    7·2 answers
  • The length of a rectangle is three times the width. A new
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!