Answer:
5 (wait i screwed up) its 23
Step-by-step explanation:
Answer:
Step-by-step explanation:
From the picture attached,
Segment AB has been divided into four equal parts.
Let each part measures equal length = 1 unit
Point C is 2 units apart from both the points A and B.
Length of AC = Length of BC = 2 units
Therefore, point C will be the mid point of segment AB.
And ratio of AC and BC = 1:1
AC:BC = 1:1
Similarly, AC:AB = 2:4
= 1:2
And BC:AB = 2:4
= 1:2
Answer:
And the 90% confidence interval would be between [566.80 and 579.20]
Step-by-step explanation:
Information given
represent the sample mean
population mean (variable of interest)
s=22 represent the sample standard deviation
n=36 represent the sample size
Confidence interval
The confidence interval for the mean is given by the following formula:
(1)
The degrees of freedom are given by:
The Confidence level is 0.90 or 90%, the significance would be
and
, and the critical value for this case would be
And replacing we got:
And the 90% confidence interval would be between [566.8033 and 579.1967]
y = -2 and x= 3
Graph is attached below. Black line is the graph of y=-2
Blue line is the graph of x=3
Whenever we get equation like x = something, in that case slope is always undefined
Whenever we get equation like y = something, in that case slope is always 0
y = -2 and x= 3
For x=3, the slope is undefined.
The graph of x=3 is a vertical line at 3 on x. The x intercept is 3 and there is no y intercept.
For y=-2, the slope is 0
The graph of y=-2 is a horizontal line at -2 on y. The y intercept is -2 and there is no x intercept.
Answer:
Step-by-step explanation:
here you go mate
step 1
-2(-4x-1)-x+3=−30 equation/Question
step 2
-2(-4x-1)-x+3=−30 distribute
7x+5=-30
step 3
7x+5=-30 subtract 5
7x=-35
step 4
divide
answer
x=-5