Work problems are solved by first figuring out how much of the job they can do in each hour. Shawn can do 1/4 of the job in an hour and Ellie can do 1/6 of the job in an hour. 1/6+1/4=2/12+3/12=5/12. This means that they can do 5/12 of the job an hour. This means that together they can do the job in 2 2/5 hours. The foreman is obviously wrong because first of all Shawn can do it alone in 4 hours, so with Ellie he will do it faster, and second of all 2 2/5<5. Hope this helped!
Please refer to the other post you saw.
Josh's estimate IS reasonable because when you have a number 5 or above after the decimal, you round up. Although it's reasonable to round up to 5 pounds, the actual amount is 4.5 pounds, or four and a half.
(y-4) (y-3)
you look at 12 and see what two factors of 12 add up to -7 and -4 times -3 is 12 and -4+-3 = -7
Answer:
the other 2 guards must be 6 feet 3 inches
Step-by-step explanation:

Sin(x) =9/25
Sin(x)=0.36
Sin^-1 (0.36)= 21.10
x=21.10