It is 4 wholes 5/16. when you divide 69 by 16 it gives you 4 remainder 5
The answer is 270 , I multiplied 15 by 18 and got 270
The grade of the path in the mountain is calculated by determining first the ratio between the rise over the run and multiplying the ratio by 100%.
For Path A:
grade = (rise / run) x 100%
grade = (1414/ 3535) x 100% = 40%
<em>Answer: 40%</em>
For Path B:
grade = (rise / run) x 100%
grade = (4.26 m/ 22 m) x 100% = 19.36%
Answer: 19.36%
Answer:
72.1110255093 cm
Step-by-step explanation:
round it if you have to