1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Harlamova29_29 [7]
3 years ago
14

What does it mean to clear a setting in a dialog box?

Computers and Technology
1 answer:
yaroslaw [1]3 years ago
5 0

Answer:

to delete it

Explanation:

You might be interested in
Suppose variables roll1 = 3 and roll2 = 4, which of the following will be evaluated as true?
Y_Kistochka [10]

Answer:

The correct answer for the given question is "  roll1>3 || roll2 > 3  "

Explanation:

In option A, there are two conditions separated by OR. In OR, if any condition  is true then it will return TRUE. There second condition is TRUE in the statement  that is why the whole expression return TRUE.

Thats why the correct answer is "roll1>3 || roll2 > 3".

5 0
3 years ago
PLEASE HURRY PLEASE HELP THIS CLASS ENDS TODAY AND I NEED HELP
Fofino [41]

Answer:

She could have given access to the computer to the techician

Explanation:

"as well as any special settings or configurations she thinks may be relevant." This might inculd any information to hack the computer

6 0
3 years ago
The beginning balance of Keyshawn's savings account for the month of September was $3900, and it remained this way for the first
Doss [256]
I’m not gonna wanna was that 638
4 0
3 years ago
The _____ contains the prerequisites for the new system, describes the alternatives that were considered, and makes a specific r
Step2247 [10]

Answer:

Option d

Explanation:

  • A Software Requirements Specification (SRS) is a depiction of a product framework to be created.  
  • SRS is a thorough evaluation of prerequisites before the more explicit framework configuration stages, and its objective is to decrease later upgrade. It ought to likewise give a reasonable premise to assessing item costs, dangers, and timetables.  
  • The product prerequisites detail report records adequate and vital necessities for the task advancement.
  • To infer the necessities, the designer needs to have clear and intensive comprehension of the items a work in progress.
  • This is accomplished through point by point and persistent correspondences with the venture group and client all through the product advancement process.
3 0
4 years ago
Back wit another one, help !?<br><br>these are two different questions btw
trapecia [35]
Question 1: Best way is option 1, Worst way is option 4.

Question 2: Best way is option 4, Worst way is option 3

7 0
3 years ago
Other questions:
  • What is the size of the key space if all 8 characters are randomly chosen 8-bit ascii characters?
    6·1 answer
  • Someone help ASAP! Match the type of information system with its description.
    13·2 answers
  • The reliance on _____ as the design methodology for relational databases is seen as a stumbling block to its use in OLAP systems
    5·1 answer
  • How to make a water bottle rocket??
    6·1 answer
  • What is the main difference between project tasks and client support tickets?
    11·1 answer
  • graphic designers can compress files in different formats . One of the formats ensures that the quality and details of the image
    7·1 answer
  • I need help with this chart !
    5·1 answer
  • When typing lists in a document, you must use single-spacing between each item in the list.
    8·1 answer
  • Activities provided for the satisfaction of others and consumed at the time of purchase<br> are…
    6·1 answer
  • As data travels further over a wavelength or frequency, what goes down?
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!