Answer:
The mechanic charged 40 for the labor per hour.
Step-by-step explanation:
Total bill paid = 375
Working hours of labor = 4 hrs
Also, the additional charges paid on the bill = 215
So, the actual labor charge paid for 4 hour labor
Actual labor Cost = Final Bill - Additional charges
= 375 - 215 = 160
Hence, the cost paid for 4 hour labor = 160
⇒ The cost paid for 1 hour labor = 160 / 4 = 40
Or, the mechanic charged 40 for the labor per hour.
Answer:
The answer to your question is letter A.
Step-by-step explanation:
Inequality x + 2 ≥ 5
Solve the inequality, remember that inequalities and equations are solved in similar ways.
- Subtract 2 in both sides
x +2 - 2 ≥ 5 - 2
- Simplify
x ≥ 3
- Remember that this sign "≥" means that x is greater or equal to a number, and this sign "≤" means that x is lower or equal to a number.
The option that satisfies our inequality is the first option.
No, it’s not a polynomial because it has three terms and a polynomial has more than three terms. It would be a trinomial.
Answer:
look at the photo x is the red and y is the blue
That is:
Seven million, two hundred and fifty eight thousand, six hundred and thirty.