Answer:
that graph will feature an area delimited by a line of slope m passing through the origin (0,0).
Since m>0 the slope is positive, meaning the line goes up.
Since the equation is y > mx, the inequality sign being >, that means the area represented will be ABOVE the line drawn.
So it will for sure include ALL quadrant II (with -x and +y values) and NONE of the quadrant IV (with +x and -y values) since the line is passing through the origin (0,0).
Answer:
When dividing by 1,000 the decimal place must shift 3 places to the left.
43 can be written as 43.
Shifting the decimal 3 places to the left gives us:
.043
Step-by-step explanation:
Square root of 324 is 18 . MARK AS THE BEST PLEASE
Answer:
The answer is below
Step-by-step explanation:
a) Cost of hiring the bicycle for 14 days is:
Cost = 65 * 14 days + 44 = 954 riyals
b) The number of days the bicycle is hired is to be the same as the number of days the bicycle is to be hired. Let us assume that the bicycle and helmet is to be hired for x days, hence:
Cost of bicycle = 65 * x + 14 = 65x + 44
Cost of helmet = 12.5 * x = 12.5x
Total cost = 65x + 44 + 12.5x = 77.5x + 44
Since 750 riyals is available, hence:
750 = 77.5x + 44
77.5x = 706
x = 9.11
Therefore the maximum number of days is 11. The total cost for 11 days is:
Total cost = 77.5(9) + 44 = 741.5 riyals
Money not spent = 750 riyals - 741.5 riyals = 8.5 riyals
Answer:
1/2
Step-by-step explanation:
thats the answer