Your answer would be A. because its talking abotu a change from being windy to raining later.
The building of a hacker rank is one that cost a lot of money and as such the minimum cost is 4.
What is the minimum cost?
The minimum cost is the lowest cost that is needed to complete a building. It depends on:
- The cost of each type of house to be built (e.g. cost of a wood house, cost of a brick house, etc.)
- The number of the type of house to be built e.g. 2 03 3 or even more.
When one is given input such as : [[1,2,3],[1,2,3],[3,3,1]] (the values in column stands for the cost of materials)
The output : 4
So you have to:
Select material-1 of cost 1 in first house(row)
Select material-2 of cost 2 in second house(row)
Select material-3 of cost 1 in third house (row)
total = 1+2+1 -> 4
Learn more about construction from
brainly.com/question/1316149
82.5820063 if you do that with straight math
or 5 lengths of 234 feet to be cut from a board, the board must have a length of at least 1170 feet.
Let x represent the total length of the board so as to allow for the cutting of 5 lengths.
Since each length needed to be cut is 234 feet, hence:
x = number of lengths × feet per board
x = 5 lengths × 234 feet
x = 1170 feet
Hence for 5 lengths of 234 feet to be cut from a board, the board must have a length of at least 1170 feet.
Find out more at: brainly.com/question/18832017
Answer:
Human capital
Explanation:
The term human capital refers to the economic value of a worker's experience and skills. Human capital includes assets like education, training, intelligence, skills, health, and other things employers value such as loyalty and punctuality.