Answer:
Marcus score is 13.7, the mean is 12.89, and the standard deviation is 1.95, so I’ll do ( 13.7 – 12.89)/ 1.95, Since Marcus' z-score is 0.415. The area to the left of the z-score is 65.9% so therefore Marcus did scored better than 65.9% of the students. So Marcus needs to score 98% better of all the other students in order for him to receive an actual certificate.
Step-by-step explanation:
Answer:
<u>Given</u>: base = 10.4ft, height = 12.5
Area of octagon = 8(1/2 × b × h)
- 8(1/2 × 10.4 × 12.5)
- 520ft²
Volume of pool = 520ft² × 3ft
Now, 1 cubic ft takes 7.5 gallons to fill.
Therefore, 1560 cubic ft takes,
So, <u>Correct choice</u> - [D] 11,700.
The growth of the population can be expected to be about 3000 a year, so for the youer 2020 the figure 53 000 is the closest 33000 + 7 x 3000 = 54 000SHOW FULL ANSWER
Your points are (-2, 7) and (18, 1). To find the slope, use the slope formula (y_2 - y_1)/(x_2 - x_1)
(18, 1) --> (x_2, y_2)
(-2, 7) --> (x_1, y_1)
(1 - 7)/(18 - (-2)) --> -6/20 --> -3/10
The slope of the line passing through the points (-2, 7) and (18, 1) is -3/10.
I believe C, because you are dividing 4 into the Length and the Width.
Forgive me if I am incorrect :))