Answer:
One convergence criteria that is useful here is that, if aₙ is the n-th term of this sequence, then we must have:
Iaₙ₊₁I < IaₙI
This means that the absolute value of the terms must decrease as n increases.
Then we must have:

We can write this as:

If we assume that n is a really big number, then:
n + 1 ≈ 1
And we can write:

Then we have the inequality

And remember that this must be in absolute value, then we will have that:
-1 < (x - 2)/3 < 1
-3 < x - 2 < 3
-3 + 2 < x < 3 + 2
-1 < x < 5
The first option looks like this, but it uses the symbols ≤≥, so it is not the same as this, then the correct option will be the second.
The question is incomplete. Here is the complete question:
A machine covers 5/8 square foot in 1/4 hour. what is the unit rate?
Answer:
2.5 square feet per hour
Step-by-step explanation:
Given:
Area covered by a machine = 
Time taken to cover the given area = 
Now, unit rate of the first quantity with respect to second quantity is the magnitude of the first quantity being when the second quantity is one unit.
Here, the first quantity is the area covered and the second quantity is the time taken.
So, unit rate is the area covered by the machine in 1 hour.
In order to find that, we use the unitary method and divide the area by the total time taken. Therefore,

Thus, the unit rate is 2.5 square feet per hour.
That would be B, C and E.
A and D could be a rhombus.
Answer:
i don't know
Step-by-step explanation:
sorry
An 544.5
Step-by-step explanation: