I don’t really know I just need points to get answers
Considering the different metrics available, a recovery time objective (RTO) is the period following a disaster that an individual IT system may remain offline.
<h3>
What is recovery time objective?</h3>
The recovery time objective (RTO) is the maximum tolerable length of time that a computer, system, network or application can be down after a failure or disaster occurs.
Thus, considering the different metrics available, a recovery time objective (RTO) is the period following a disaster that an individual IT system may remain offline.
Learn more about recovery time here: brainly.com/question/12845081
#SPJ1
C because the points are deducted for skipped
Answer:
200 + 6n
Do not know what you wrote as answer choices, but this is correct.
They charge a one time fee of 200 to start - this is the constant.
They also charge 6 per shirt, this gives the equation 6n.
Now, add the two terms.
You should get:
200 + 6n as the expression.
Answer: Its A
Explanation:Just plug in the variable 7.75 min to grade a quiz, q
12.4 minutes to grade a paper, p
for a total of 465 minutes
and they have 51 tests and quizzes in total