Answer:
$33,700 (Favorable)
Explanation:
Note: Figures are not inputted. The missing figures have been figured out as below.
"<em>Nexus industries uses a standard costing system to apply manufacturing costs to its production process. In May nexus anticipated 2700 units with fixed manufacturing overhead costs allocated at $8.40 per direct labor hour with a standard of 2.5 direct labor hours per unit. In May, actual production was 3400 units and actual fixed manufacturing overhead cost were $23000. What was nexus fixed manufacturing overhead volume variance in May</em>?"
Solution:
Budgeted fixed overhead costs = Units * Direct labor cost * Standard Direct Labor hours per unit
= 2,700 units * $8.40 * 2.5
= 2,700 units * 21
= $56,700
Fixed manufacturing overhead volume variance = Actual fixed overhead cost - Budgeted fixed manufacturing overhead costs
When Actual fixed overhead = $23,000
, Budgeted fixed overhead costs = $56,700
Fixed manufacturing overhead volume variance = $23,000 - $56,700
= $33,700 (Favorable)
.
Answer:
IRR is greater than required return by 17.38 - 16.8 % = 0.58 %
so project will accept
Explanation:
given data
initial cost = $38,000
cash inflows year 1 = $12,300
cash inflows year 2= $24,200
cash inflows year 3 = $16,100
rate of return = 16.8 %
solution
we consider here IRR is = x so
present value of inflows is equal to present value of outflows .............1
we can say that it as
initial cost = present value
3800 = 
solve it we get
x = 17.38%
here IRR is greater than required return by 17.38 - 16.8 % = 0.58 %
so project will accept
The answers are the following:
a.
Brandon:
$7,000 + [($10,000/4)×3¿= $8,500
Ryan:
$7,000 + [($10,000/4)×1¿= $7,500
b.
Brandon $7,000
Ryan <span>$7,000</span>